China’s First Extra High Voltage Cables Highlights – Liujiaxia Hydropower Station (figure) –

Looking For Cheap Flights To Malaga


Cheap Flights to Malaga

Origin Departure date Return date Find Ticket

Barcelona

12.09.2017

15.09.2017

Tickets from 78

Berlin

08.12.2017

11.12.2017

Tickets from 80

London

13.10.2017

20.10.2017

Tickets from 80

Bristol

24.09.2017

28.09.2017

Tickets from 86

Dusseldorf

22.01.2018

28.01.2018

Tickets from 87

Paris

15.10.2017

18.10.2017

Tickets from 91

Liverpool

04.09.2017

13.09.2017

Tickets from 97

Seville

08.11.2017

30.11.2017

Tickets from 107

Bilbao

03.10.2017

10.10.2017

Tickets from 108

Brussels

31.08.2017

08.09.2017

Tickets from 125

Turin

30.08.2017

06.09.2017

Tickets from 127

Milan

12.10.2017

15.10.2017

Tickets from 129

Manchester

02.09.2017

12.09.2017

Tickets from 133

Luxembourg

16.12.2017

09.01.2018

Tickets from 134

Frankfurt

08.09.2017

11.09.2017

Tickets from 138

Warsaw

02.10.2017

16.10.2017

Tickets from 139

Prague

05.10.2017

11.10.2017

Tickets from 145

Belfast

08.09.2017

11.09.2017

Tickets from 154

Hamburg

12.09.2017

19.09.2017

Tickets from 156

Helsinki

11.09.2017

19.09.2017

Tickets from 162

Saint Petersburg

09.10.2017

25.10.2017

Tickets from 166

Cardiff

27.07.2017

02.08.2017

Tickets from 173

Kiev

20.01.2018

04.02.2018

Tickets from 179

Vienna

08.11.2017

18.12.2017

Tickets from 180

Dublin

24.10.2017

30.10.2017

Tickets from 181

Birmingham

11.08.2017

14.08.2017

Tickets from 188

Moscow

27.01.2018

03.02.2018

Tickets from 189

Vilnius

17.09.2017

28.09.2017

Tickets from 189

Riga

19.09.2017

29.09.2017

Tickets from 202

Madrid

14.08.2017

21.08.2017

Tickets from 202

Cologne

05.09.2017

16.09.2017

Tickets from 202

Bologna

23.08.2017

27.08.2017

Tickets from 209

Amsterdam

03.08.2017

07.08.2017

Tickets from 209

Doncaster

02.08.2017

12.08.2017

Tickets from 218

Zurich

11.08.2017

16.08.2017

Tickets from 249

Mulhouse

08.09.2017

11.09.2017

Tickets from 229

Venice

23.08.2017

27.08.2017

Tickets from 233

Shannon

11.08.2017

18.08.2017

Tickets from 245

Bucharest

26.08.2017

12.09.2017

Tickets from 245

Istanbul

30.09.2017

14.10.2017

Tickets from 255

Munich

04.08.2017

06.08.2017

Tickets from 263

Rome

05.08.2017

18.08.2017

Tickets from 275

Lisbon

25.08.2017

28.08.2017

Tickets from 281

Tallinn

13.08.2017

24.08.2017

Tickets from 282

Krakow

30.07.2017

09.08.2017

Tickets from 296

Chisinau

26.09.2017

06.10.2017

Tickets from 301

Kazan

26.08.2017

06.09.2017

Tickets from 302

Wroclaw

07.08.2017

14.08.2017

Tickets from 306

Budapest

17.08.2017

31.08.2017

Tickets from 311

Ekaterinburg

14.09.2017

25.09.2017

Tickets from 319

Nizhniy Novgorod

23.08.2017

03.09.2017

Tickets from 323

Marseille

26.07.2017

01.08.2017

Tickets from 323

Nantes

05.08.2017

19.08.2017

Tickets from 326

Copenhagen

26.07.2017

07.08.2017

Tickets from 336

Perm

12.09.2017

03.10.2017

Tickets from 344

Novosibirsk

01.10.2017

12.10.2017

Tickets from 351

Kirkenes

02.05.2018

17.05.2018

Tickets from 356

Stockholm

05.08.2017

08.08.2017

Tickets from 357

Belgrade

21.08.2017

28.08.2017

Tickets from 359

Tbilisi

07.09.2017

18.09.2017

Tickets from 359

Minsk

10.10.2017

13.10.2017

Tickets from 363

Rostov

01.09.2017

07.09.2017

Tickets from 368

Mineralnye Vody

09.12.2017

21.12.2017

Tickets from 381

Klagenfurt

21.09.2017

01.10.2017

Tickets from 385

Ufa

07.09.2017

21.09.2017

Tickets from 393

Chelyabinsk

25.10.2017

03.11.2017

Tickets from 393

Samara

18.09.2017

27.09.2017

Tickets from 395

Krasnodar

27.11.2017

25.12.2017

Tickets from 405

Naberevnye Chelny

11.09.2017

29.09.2017

Tickets from 434

Astrakhan

23.09.2017

06.10.2017

Tickets from 435

Voronezh

19.08.2017

03.09.2017

Tickets from 451

Odessa

31.07.2017

07.08.2017

Tickets from 474

Kaunas

03.08.2017

22.08.2017

Tickets from 474

Sochi

11.09.2017

23.09.2017

Tickets from 477

Astana

08.09.2017

23.09.2017

Tickets from 486

Tel Aviv-Yafo

01.08.2017

07.08.2017

Tickets from 494

Krasnojarsk

12.09.2017

19.09.2017

Tickets from 499

Larnaca

31.07.2017

07.08.2017

Tickets from 512

Syktyvkar

02.10.2017

08.10.2017

Tickets from 559

Abha

31.03.2018

05.04.2018

Tickets from 560

Jeddah

23.01.2018

02.02.2018

Tickets from 569

Kaliningrad

19.08.2017

31.08.2017

Tickets from 593

Orenburg

31.07.2017

11.08.2017

Tickets from 599

Irkutsk

30.09.2017

14.10.2017

Tickets from 609

Kuwait City

16.08.2017

01.10.2017

Tickets from 672

Omsk

19.08.2017

02.09.2017

Tickets from 747

Simferopol

18.08.2017

09.09.2017

Tickets from 748

Almaty

01.08.2017

11.08.2017

Tickets from 830

Montreal

11.09.2017

28.09.2017

Tickets from 861

Maastricht

19.10.2017

22.10.2017

Tickets from 1 103

Tampa

02.11.2017

24.11.2017

Tickets from 1 139

San Jose

15.08.2017

10.02.2018

Tickets from 1 376

Yongjing Liujiaxia Hydropower Station was built in the Yellow River on the county. It is the former hydroelectric power station is responsible for surveying the Northwest Survey and Design Institute, Beijing Design Institute survey, Liujiaxia Hydropower Engineering Bureau (now the Bureau of Water 4) bear the national construction and installation of the first mega kilowatt hydropower station. Station 147 m high dam, dam crest length 840 m, 204 m long main dam, top width of 16 meters, located 350-ton gantry Crane , A lift from the factory through crest.

Liujiaxia Power Station is based on the First National People Table The second meeting of the General Assembly “adopted by the radical damage and the development of the Yellow River Yellow River Comprehensive Water Planning The resolution “, in accordance with the” independence

Self-reliance “policy, its own investigation and design, their manufacturing equipment, its construction and installation, commissioning management, their first million kilowatts over the domestic large-scale hydroelectric power stations.

1956 3 month of the preliminary design, in September 1958 to commence work April 1, 1969 the first generating unit, all built in 1974. A total of 5 sets of water wheels installed Generator Group, with a total installed capacity of 1,225,000 kilowatts, designed annual generating capacity of 5.7 billion kwh. Power from the four 220,000-volt and a 330,000-volt transmission lines sent Lanzhou, Tianshui, Qinghai and Shaanxi Guanzhong region Machinery and equipment Lack of technical means backward, living conditions were difficult, the masses of builders to carry forward the “no conditions, to create the conditions have to” and not afraid of difficult and arduous struggle, after a year of hard work, achieved in 1960 New Year’s Day river closure. Was on May 1, the main dam began pouring concrete 134 thousand cubic meters in 1964 resumed in May 1968 to begin the installation, water gates in late October. March 29, 1969, the first unit commissioning, in December 1974, all 5 units in operation. The whole project Investment 638 million yuan. So far, the country’s first large capacity of 1 million kilowatts or more into hydropower victory.

Plant located downstream of the main dam, the dam toe, closed underground mix plant. Plant length 169.8 meters. The installation of five hydroelectric generating unit, security capacity of 1.32 million kilowatts, Output of 400,000 kilowatts, designed annual generating capacity of 5.7 billion kwh. Boost plant a total of 5 sets Transformer , 1 220 kV and 330 kV transformer in. Switching Station 3, that is, underground 220 kV, 220 kV and 330 kV toe switch stations, high-pressure Cable Up to a thousand meters. Outlet 5 back. One 220 kV outlet 4 back. Strong power switching station by four by three 220,000-volt and a 330,000-volt transmission line, sub-four transportation to Lanzhou, Tianshui, Xining, off the middle region, to Shaanxi, Gansu, Qinghai and other provinces of the grid linked together, which Liujiaxia vital in more than 530 km long, 330,000 volt transmission lines are built in China for the first time to the longest transmission line is known. Liujiaxia Hydropower Station in order to form a hub for the Northwest Power Grid.

For the manufacture of extra high voltage power cables Liujiaxia Hydropower Station, the new China is placed in front of the young cable industry, a major task. Shenyang Cable Factory and Shanghai Cable Works undertook one of the glorious and arduous mission, is cable plant two Chinese large independent, self-reliance in manufacturing extra high voltage cables, the starting point for creating brilliant achievements.

Liujiaxia Hydropower Station is a masterpiece of Chinese working class, Gansu Provincial Committee in 1995, was named the patriotism education base. [Popular Keywords]: Popular Wire & Cable Comment Large In Small

I am a professional writer from China Manufacturers, which contains a great deal of information about wicker sofa bed , rattan bathroom furniture

Find More Málaga Articles

People who search for Cheap Flights To Malaga also searches for :

cheap flights to malaga
cheap flights to malaga spain
cheap flights from gatwick to malaga
cheap flights to malaga from london
cheap flights from barcelona to malaga spain
cheap flights from madrid to malaga
cheap flights from london to malaga
cheap flights from barcelona to malaga
cheap flights london to malaga
cheap flights from dublin to malaga
cheap flights to malaga from gatwick
cheap flights to malaga airport
cheap flights from cardiff to malaga

LEAVE A REPLY

Please enter your comment!
Please enter your name here